Electrical and plumbing
Wiring, the board, water runs — priced per square metre.
Rewiring and replumbing in Tbilisi as of 19 October 2026: for a 65 m² flat in standard grade about 6,406 ₾ (99 ₾/m²), consumer unit included; from economy to premium 5,060–8,883 ₾.
·
roughly
78–137 ₾/m²
typical size 65 m² — 5,060 ₾–8,883 ₾
Priced from a maintained list of real Tbilisi rates. The final price is confirmed by a contractor on site.
Free for homeowners
- Wiring and the board as separate lines
- Water runs counted by wet zone
- Concealed work photographed before it is closed up
What is included
Three lines: wiring (counted by point — sockets, switches, lights), the consumer unit, and water and drainage runs by wet zone. Fitting sockets and lights and installing the fixtures are separate lines: they are done at the end of the finishing.
Concealed work is handed over with photos before it is covered: you accept the stage from the photo report while the wall is still open. The plastering stage cannot be accepted before the rough services stage.
Line-by-line estimate: 65 m², standard
| Line | Quantity | Labour | Material | Total |
|---|---|---|---|---|
| Electrical wiring | 33 pcs | 957 ₾ | 1,815 ₾ | 2,772 ₾ |
| Electrical panel | 1 pcs | 415 ₾ | 315 ₾ | 730 ₾ |
| Plumbing rough-in | 18 m² | 1,404 ₾ | 918 ₾ | 2,322 ₾ |
| Labour and materials | 2,776 ₾ | 3,048 ₾ | 5,824 ₾ | |
| Contingency (4%) | 233 ₾ | |||
| Delivery (4%) | 233 ₾ | |||
| Waste removal (2%) | 116 ₾ | |||
| Total | 6,406 ₾ | |||
Stages and duration
The plan will contain these stages, in this order. Duration — 1 month (13–20 days).
- Rough electrical
- Rough plumbing
- Final fit-out & cleanup
Free, no account, no phone number. Nothing reaches a contractor until you decide.
How it is calculated
- Price list: every work has a labour price and a material price per unit (m², point, piece) — Tbilisi rates. It is the same list the calculator uses.
- Quantities: derived from the area by norms — wall area, wet zones, the number of doors and electrical points.
- Set of works: by condition. In a white frame, for example, plaster, screed and rough wiring are already done and are not charged. Of interchangeable works (laminate or porcelain tile) only one is counted.
- Overheads as separate lines: contingency 4%, delivery of materials 4%, waste removal 2%.
- Accuracy ±15%. The exact price is named by the contractor after seeing the property, and it is fixed in the contract.
- The rates come from Tbilisi crews' estimates and output norms. No renovation has been completed on the platform yet, so the figures will be refined once one has.
How a renovation runs on SIVRCE
- 1
Estimate
You pick the property type, area, condition and grade — the price appears at once, broken down by work. No account, no phone number, and nothing is sent to anyone.
- 2
Request or invitation
When you decide, you send a request or invite a specific contractor from their profile. Your phone number and address are seen only by the contractor you chose or who accepted your invitation.
- 3
Site visit and measuring
The contractor proposes a time and you confirm it. On site they measure and check what a floor plan does not show: walls, floor, wiring.
- 4
Offer and contract
After the visit the contractor sends an offer: amount, lines, dates, warranty. Accepting it is the contract. There is no contract before the visit — the system does not allow it.
- 5
Stages you accept
The work is split into stages. The contractor hands each stage over with photos and you accept it — in order: a stage cannot be accepted before the one it depends on.
- 6
Price changes only with your consent
After the contract the price changes only through an estimate change: the contractor states the reason, the amount and the days, and the change takes effect only once you approve it.
- 7
Handover and warranty
At the end you sign the acceptance act and the warranty begins. You pay the contractor directly; receipts are uploaded and confirmed by the other side — SIVRCE neither holds nor moves your money.
Common questions
- How much does it cost to rewire and replumb a flat?
- As of 19 October 2026, about 6,406 ₾ for a 65 m² flat in standard grade — electrics, consumer unit and water together, materials and overheads included.
- Why is wiring priced by point rather than per metre?
- Because the work grows with the number of points, not the area: two flats of the same size can have very different numbers of sockets and lights.
- How long does it take?
- In the plan it is two stages — rough electrics and rough plumbing — running in parallel after the partitions; for a 65 m² flat — 1 month.
- Can I have just the electrics, without a full renovation?
- Yes. Tick only the lines you need in the calculator — nothing else is counted.
- Is this the final price?
- No. It is a calculation from the price list, accurate to ±15%. The final price is named by the contractor after the site visit, and it is fixed in the contract.
- Can the price rise after the contract?
- Only through an estimate change that you approve: the contractor states the reason, the amount and any extra days. Without your approval the price does not change.
- What does SIVRCE cost the homeowner?
- Nothing. The estimate, the request and tracking the renovation are free for the homeowner. The platform fee is paid by the contractor, and it becomes due only after you have accepted the work.
- How do I pay?
- Directly to the contractor. You upload the payment receipt to the project and the contractor confirms it; if the amounts differ, an administrator reviews both receipts. SIVRCE does not hold the money.