Black frame renovation cost

Bare walls and slab, no services — everything from scratch.

As of 16 October 2026, renovating a black frame flat in Tbilisi costs 700–1,545 ₾ per m²; a 65 m² flat in standard grade comes to about 57,508 ₾ and 3–4 months, labour, materials and overheads included.

·

Price by grade, 65 m² flat

Grade₾/m²65 m²
Economy700 ₾/m²45,521 ₾
Standard885 ₾/m²57,508 ₾
Premium1,545 ₾/m²100,433 ₾

What a black frame is

A black frame is how new-build flats are handed over: walls and floor slab, entrance door and windows, and nothing inside. Partitions, electrics and plumbing, plaster, screed and every finish are on the buyer.

Demolition is not charged here — there is nothing to strip. Nor are foundations or roofing: the frame is standing. Everything else is counted, which is why a black frame costs about as much as fully renovating an old flat.

If the developer has done part of it

A "black frame" is often handed over partly done — with partitions, for example. On the estimate page you can tick what the developer has already done: screed, plaster, rough electrics and plumbing, waterproofing, partitions. Whatever you tick is taken off the price.

Line-by-line estimate: 65 m², standard

LineQuantityLabourMaterialTotal
Block wall52 m²3,120 ₾1,924 ₾5,044 ₾
Door installation5 pcs1,650 ₾750 ₾2,400 ₾
Waterproofing18 m²648 ₾522 ₾1,170 ₾
Floor screed65 m²1,560 ₾1,235 ₾2,795 ₾
Electrical wiring33 pcs957 ₾1,815 ₾2,772 ₾
Sockets and fixtures33 pcs396 ₾165 ₾561 ₾
Electrical panel1 pcs415 ₾315 ₾730 ₾
Plumbing rough-in18 m²1,404 ₾918 ₾2,322 ₾
Bathroom tiling38 m²2,090 ₾3,800 ₾5,890 ₾
Ceiling skim coat65 m²1,755 ₾910 ₾2,665 ₾
Sanitaryware installation4 pcs1,240 ₾280 ₾1,520 ₾
Wall skim coat149 m²4,470 ₾2,086 ₾6,556 ₾
Wall painting149 m²2,235 ₾2,980 ₾5,215 ₾
Porcelain floor tiling47 m²2,068 ₾3,290 ₾5,358 ₾
Skirting54 lin. m702 ₾756 ₾1,458 ₾
Ceiling painting65 m²975 ₾1,300 ₾2,275 ₾
Wall plastering169 m²2,197 ₾1,352 ₾3,549 ₾
Labour and materials27,882 ₾24,398 ₾52,280 ₾
Contingency (4%)2,091 ₾
Delivery (4%)2,091 ₾
Waste removal (2%)1,046 ₾
Total57,508 ₾

Not charged ("Black frame" — already done or not done at all): Demolition.

Stages and duration

The plan will contain these stages, in this order. Duration — 3–4 months (94–122 days), including screed and plaster drying time.

  1. Partitions
  2. Rough electrical
  3. Rough plumbing
  4. Plastering
  5. Floor screed
  6. Waterproofing
  7. Tiling
  8. Ceilings
  9. Wall finishing
  10. Finish flooring
  11. Doors
  12. Final fit-out & cleanup
Your exact estimate in 2 minutes

Free, no account, no phone number. Nothing reaches a contractor until you decide.

How it is calculated

How a renovation runs on SIVRCE

  1. 1

    Estimate

    You pick the property type, area, condition and grade — the price appears at once, broken down by work. No account, no phone number, and nothing is sent to anyone.

  2. 2

    Request or invitation

    When you decide, you send a request or invite a specific contractor from their profile. Your phone number and address are seen only by the contractor you chose or who accepted your invitation.

  3. 3

    Site visit and measuring

    The contractor proposes a time and you confirm it. On site they measure and check what a floor plan does not show: walls, floor, wiring.

  4. 4

    Offer and contract

    After the visit the contractor sends an offer: amount, lines, dates, warranty. Accepting it is the contract. There is no contract before the visit — the system does not allow it.

  5. 5

    Stages you accept

    The work is split into stages. The contractor hands each stage over with photos and you accept it — in order: a stage cannot be accepted before the one it depends on.

  6. 6

    Price changes only with your consent

    After the contract the price changes only through an estimate change: the contractor states the reason, the amount and the days, and the change takes effect only once you approve it.

  7. 7

    Handover and warranty

    At the end you sign the acceptance act and the warranty begins. You pay the contractor directly; receipts are uploaded and confirmed by the other side — SIVRCE neither holds nor moves your money.

Common questions

How much does a black frame renovation cost per square metre?
As of 16 October 2026, 700–1,545 ₾/m² depending on the grade; standard is 885 ₾/m². That covers labour, materials and overheads.
How long does a black frame renovation take?
For a 65 m² flat — 3–4 months. The longest wait is the screed: a 50 mm layer takes about 42 days to dry, and the floor cannot go down before that.
Are partitions included?
Yes, by default: a black frame usually has none. If the developer has already built them, tick that on the estimate page and they come off the price.
Is this the final price?
No. It is a calculation from the price list, accurate to ±15%. The final price is named by the contractor after the site visit, and it is fixed in the contract.
Can the price rise after the contract?
Only through an estimate change that you approve: the contractor states the reason, the amount and any extra days. Without your approval the price does not change.
What does SIVRCE cost the homeowner?
Nothing. The estimate, the request and tracking the renovation are free for the homeowner. The platform fee is paid by the contractor, and it becomes due only after you have accepted the work.