Market prices · Tbilisi
Renovation prices 2026
Market prices for renovation works — labour and materials separately, no hidden markups. Our calculator is built on this very catalog.
Preparation
| Unit | Labour | Material | |
|---|---|---|---|
| Demolition | m² | 24 ₾ | 5 ₾ |
Structural
| Unit | Labour | Material | |
|---|---|---|---|
| Block wall | m² | 60 ₾ | 37 ₾ |
| Drywall partition | m² | 75 ₾ | 37 ₾ |
Finishing
| Unit | Labour | Material | |
|---|---|---|---|
| Door installation | pcs | 330 ₾ | 150 ₾ |
| Ceiling skim coat | m² | 27 ₾ | 14 ₾ |
| Wall skim coat | m² | 30 ₾ | 14 ₾ |
| Wall painting | m² | 15 ₾ | 20 ₾ |
| Porcelain floor tiling | m² | 44 ₾ | 70 ₾ |
| Wallpaper | m² | 17 ₾ | 31 ₾ |
| Skirting | lin. m | 13 ₾ | 14 ₾ |
| Ceiling painting | m² | 15 ₾ | 20 ₾ |
Waterproofing
| Unit | Labour | Material | |
|---|---|---|---|
| Waterproofing | m² | 36 ₾ | 29 ₾ |
| Floor screed | m² | 24 ₾ | 19 ₾ |
Electrical
| Unit | Labour | Material | |
|---|---|---|---|
| Electrical wiring | pcs | 29 ₾ | 55 ₾ |
| Sockets and fixtures | pcs | 12 ₾ | 5 ₾ |
| Electrical panel | pcs | 415 ₾ | 315 ₾ |
Plumbing
| Unit | Labour | Material | |
|---|---|---|---|
| Plumbing rough-in | m² | 78 ₾ | 51 ₾ |
| Bathroom tiling | m² | 55 ₾ | 100 ₾ |
| Sanitaryware installation | pcs | 310 ₾ | 70 ₾ |
Plastering
| Unit | Labour | Material | |
|---|---|---|---|
| Wall plastering | m² | 13 ₾ | 8 ₾ |
Financing calculator
See your renovation as a monthly payment.
Estimate the monthly instalment for financing your renovation. We pre-fill the average GEL mortgage rate from the National Bank of Georgia — adjust any number to match your offer.
Down payment15% · 7,500 ₾
Loan term10 years
%
Avg. GEL mortgage rate — National Bank of Georgia, Mar 2026. Editable.
Prices are indicative (Standard grade, Tbilisi, 2025–2026). The rates come from Tbilisi crews' quotes and output norms; no job has been completed on the platform yet, so the figures will be corrected once one has. The site is in beta and the calculation can be wrong. The exact price is named by the contractor after a site visit.