As of 18 October 2026, renovating a house costs roughly 983–1,977 ₾ per m² when the house is standing and was last renovated long ago; a 140 m² house in standard grade comes to about 172,652 ₾ and takes 5–6.5 months.

·

roughly

983–1977 ₾/m²

typical size 140 m² — 137,636 ₾–276,755 ₾

Priced from a maintained list of real Tbilisi rates. The final price is confirmed by a contractor on site.

Get a price

Free for homeowners

Price by property condition

Price by property condition
Property conditionEconomyStandardPremiumDuration (standard)
Existing buildingstanding house, last renovated long ago983 ₾/m²1,233 ₾/m²1,977 ₾/m²5–6.5 months
No interior finishesbare walls and slab, no services1,021 ₾/m²1,286 ₾/m²2,063 ₾/m²4.5–6 months
With rough finishesplastered, screeded, services roughed in — no finishes677 ₾/m²869 ₾/m²1,486 ₾/m²4–5 months
Cosmetic refreshsurfaces only, floors and pipes stay629 ₾/m²801 ₾/m²1,223 ₾/m²4–5 months

How a house differs from a flat

A house has work a flat does not: its own heating, the roof, insulation, foundations. When renovating an existing house, heating is counted by default; foundations, roofing and insulation are not — they are rarely ordered. If you need them, tick them on the estimate page.

The price follows the house's geometry: a house has more wall area than a flat of the same size.

Line-by-line estimate: 140 m², standard

LineQuantityLabourMaterialTotal
Block wall112 m²8,624 ₾6,048 ₾14,672 ₾
Electrical wiring70 pcs2,100 ₾3,850 ₾5,950 ₾
Heating140 m²13,300 ₾16,800 ₾30,100 ₾
Sockets and fixtures70 pcs840 ₾350 ₾1,190 ₾
Plumbing rough-in25 m²2,125 ₾1,500 ₾3,625 ₾
Floor screed140 m²3,920 ₾3,080 ₾7,000 ₾
Sanitaryware installation5 pcs1,550 ₾350 ₾1,900 ₾
Wall skim coat364 m²12,376 ₾6,188 ₾18,564 ₾
Porcelain floor tiling115 m²5,175 ₾8,510 ₾13,685 ₾
Demolition140 m²3,500 ₾700 ₾4,200 ₾
Electrical panel1 pcs436 ₾315 ₾751 ₾
Waterproofing25 m²950 ₾725 ₾1,675 ₾
Bathroom tiling67 m²6,164 ₾6,700 ₾12,864 ₾
Door installation9 pcs3,123 ₾1,350 ₾4,473 ₾
Ceiling skim coat140 m²4,060 ₾1,960 ₾6,020 ₾
Ceiling painting140 m²2,240 ₾2,800 ₾5,040 ₾
Wall painting364 m²5,824 ₾7,280 ₾13,104 ₾
Skirting134 lin. m1,742 ₾1,876 ₾3,618 ₾
Wall plastering406 m²5,278 ₾3,248 ₾8,526 ₾
Labour and materials83,327 ₾73,630 ₾156,957 ₾
Contingency (4%)6,278 ₾
Delivery (4%)6,278 ₾
Waste removal (2%)3,139 ₾
Total172,652 ₾

Stages and duration

The plan will contain these stages, in this order. Duration — 5–6.5 months (144–190 days), including screed and plaster drying time.

  1. Demolition
  2. Partitions
  3. Rough electrical
  4. Rough plumbing
  5. Plastering
  6. Floor screed
  7. Waterproofing
  8. Tiling
  9. Ceilings
  10. Wall finishing
  11. Finish flooring
  12. Doors
  13. Final fit-out & cleanup
Your exact estimate in 2 minutes

Free, no account, no phone number. Nothing reaches a contractor until you decide.

How it is calculated

How a renovation runs on SIVRCE

  1. 1

    Estimate

    You pick the property type, area, condition and grade — the price appears at once, broken down by work. No account, no phone number, and nothing is sent to anyone.

  2. 2

    Request or invitation

    When you decide, you send a request or invite a specific contractor from their profile. Your phone number and address are seen only by the contractor you chose or who accepted your invitation.

  3. 3

    Site visit and measuring

    The contractor proposes a time and you confirm it. On site they measure and check what a floor plan does not show: walls, floor, wiring.

  4. 4

    Offer and contract

    After the visit the contractor sends an offer: amount, lines, dates, warranty. Accepting it is the contract. There is no contract before the visit — the system does not allow it.

  5. 5

    Stages you accept

    The work is split into stages. The contractor hands each stage over with photos and you accept it — in order: a stage cannot be accepted before the one it depends on.

  6. 6

    Price changes only with your consent

    After the contract the price changes only through an estimate change: the contractor states the reason, the amount and the days, and the change takes effect only once you approve it.

  7. 7

    Handover and warranty

    At the end you sign the acceptance act and the warranty begins. You pay the contractor directly; receipts are uploaded and confirmed by the other side — SIVRCE neither holds nor moves your money.

Common questions

How much does a house renovation cost per square metre?
As of 18 October 2026, a full renovation of an existing house is 983–1,977 ₾/m² depending on the grade; standard is 1,233 ₾/m².
How long does a house renovation take?
For a 140 m² house — 5–6.5 months. Several crews work on a large site, but drying time does not shrink.
Why does a house price differently from a flat?
Work appears that a flat never has: its own heating, the roof, insulation.
Is this the final price?
No. It is a calculation from the price list, accurate to ±15%. The final price is named by the contractor after the site visit, and it is fixed in the contract.
Can the price rise after the contract?
Only through an estimate change that you approve: the contractor states the reason, the amount and any extra days. Without your approval the price does not change.
What does SIVRCE cost the homeowner?
Nothing. The estimate, the request and tracking the renovation are free for the homeowner. The platform fee is paid by the contractor, and it becomes due only after you have accepted the work.
How do I pay?
Directly to the contractor. You upload the payment receipt to the project and the contractor confirms it; if the amounts differ, an administrator reviews both receipts. SIVRCE does not hold the money.