Skip to content

Kitchen renovation

Wiring, plumbing, surfaces — in one estimate.

Kitchen renovation in Tbilisi as of 18 October 2026: a 10 m² kitchen in standard grade costs about 9,713 ₾ (971 ₾/m²), from economy to premium 7,702–16,703 ₾, excluding units and appliances; it takes 2 months.

·

roughly

770–1670 ₾/m²

typical size 10 m² — 7,702 ₾–16,703 ₾

Priced from a maintained list of real Tbilisi rates. The final price is confirmed by a contractor on site.

Get a price

Free for homeowners

What a kitchen renovation includes

Demolition, wiring for the appliances, water and drainage at the sink, screed, wall plaster, filling and paint, floor tiles, skirting, the ceiling, a door, sockets and lights. Kitchen units and appliances are not included — you choose them separately.

What moves the price most is the number of electrical points for appliances: the oven, the dishwasher and the hood each need their own circuit. On the estimate page the number of points is a line of its own and can be changed.

Why a kitchen takes longer than it looks

There are not many working days, but a new screed has to dry before tiles go down — about 42 days at 50 mm. If the old screed is sound, the contractor sees it at the visit, the line drops out, and so does the time.

Line-by-line estimate: 10 m², standard

LineQuantityLabourMaterialTotal
Demolition10 m²240 ₾50 ₾290 ₾
Door installation1 pcs330 ₾150 ₾480 ₾
Floor screed10 m²240 ₾190 ₾430 ₾
Electrical wiring12 pcs348 ₾660 ₾1,008 ₾
Sockets and fixtures12 pcs144 ₾60 ₾204 ₾
Plumbing rough-in3 m²234 ₾153 ₾387 ₾
Ceiling skim coat10 m²270 ₾140 ₾410 ₾
Sanitaryware installation1 pcs310 ₾70 ₾380 ₾
Wall skim coat34 m²1,020 ₾476 ₾1,496 ₾
Wall painting34 m²510 ₾680 ₾1,190 ₾
Porcelain floor tiling10 m²440 ₾700 ₾1,140 ₾
Skirting13 lin. m169 ₾182 ₾351 ₾
Ceiling painting10 m²150 ₾200 ₾350 ₾
Wall plastering34 m²442 ₾272 ₾714 ₾
Labour and materials4,847 ₾3,983 ₾8,830 ₾
Contingency (4%)353 ₾
Delivery (4%)353 ₾
Waste removal (2%)177 ₾
Total9,713 ₾

Stages and duration

The plan will contain these stages, in this order. Duration — 2 months (59–67 days), including screed and plaster drying time.

  1. Demolition
  2. Rough electrical
  3. Rough plumbing
  4. Plastering
  5. Floor screed
  6. Ceilings
  7. Wall finishing
  8. Finish flooring
  9. Doors
  10. Final fit-out & cleanup
Your exact estimate in 2 minutes

Free, no account, no phone number. Nothing reaches a contractor until you decide.

How it is calculated

How a renovation runs on SIVRCE

  1. 1

    Estimate

    You pick the property type, area, condition and grade — the price appears at once, broken down by work. No account, no phone number, and nothing is sent to anyone.

  2. 2

    Request or invitation

    When you decide, you send a request or invite a specific contractor from their profile. Your phone number and address are seen only by the contractor you chose or who accepted your invitation.

  3. 3

    Site visit and measuring

    The contractor proposes a time and you confirm it. On site they measure and check what a floor plan does not show: walls, floor, wiring.

  4. 4

    Offer and contract

    After the visit the contractor sends an offer: amount, lines, dates, warranty. Accepting it is the contract. There is no contract before the visit — the system does not allow it.

  5. 5

    Stages you accept

    The work is split into stages. The contractor hands each stage over with photos and you accept it — in order: a stage cannot be accepted before the one it depends on.

  6. 6

    Price changes only with your consent

    After the contract the price changes only through an estimate change: the contractor states the reason, the amount and the days, and the change takes effect only once you approve it.

  7. 7

    Handover and warranty

    At the end you sign the acceptance act and the warranty begins. You pay the contractor directly; receipts are uploaded and confirmed by the other side — SIVRCE neither holds nor moves your money.

Common questions

How much does a 10 m² kitchen renovation cost?
As of 18 October 2026, about 9,713 ₾ in standard grade, 7,702 ₾ in economy and 16,703 ₾ in premium — excluding units and appliances.
How long does a kitchen renovation take?
For a 10 m² kitchen — 2 months; most of it is the new screed drying.
My kitchen is open to the living room — how do I price it?
Two ways: price just the kitchen area as a room of its own, or the whole flat — then the estimate page asks whether the kitchen is separate or open to the living room, which changes the wall area and the number of doors.
Are the units included?
No. The estimate covers the building work; the kitchen units you choose separately, and they are not in the estimate.
Is this the final price?
No. It is a calculation from the price list, accurate to ±15%. The final price is named by the contractor after the site visit, and it is fixed in the contract.
Can the price rise after the contract?
Only through an estimate change that you approve: the contractor states the reason, the amount and any extra days. Without your approval the price does not change.
What does SIVRCE cost the homeowner?
Nothing. The estimate, the request and tracking the renovation are free for the homeowner. The platform fee is paid by the contractor, and it becomes due only after you have accepted the work.
Are fixtures, furniture and appliances included?
No. The price covers labour and material on every line — installing the plumbing fixtures, for example. The fixtures themselves, furniture and appliances are your choice and are not in the per-metre price.