How to choose a renovation contractor in Tbilisi
Updated: · SIVRCE editorial team
Choose a contractor on three things: checked documents and real work, a site visit with measurement before the contract, and an itemised estimate with stages. In SIVRCE a contractor's quote cannot be accepted until their site visit has taken place.
What "verified" means
A badge on a contractor's card means only what was actually checked. A level is not "awarded" — it follows from the checks: until every required check is recorded, the level cannot be granted.
| Level | What it means | What must be checked |
|---|---|---|
| Registered | Contact and registration details checked. | — |
| Verified | Documents, experience and completed work checked. | identity document, tax registration, photos of real work |
| Fully verified | Plus an in-person check by SIVRCE. | identity document, tax registration, photos of real work, an in-person check by SIVRCE |
Insurance and references from past clients are recorded separately and shown on the card, but they do not change the level. A contractor with no badge is "registered" — and nothing more.
How to read a contractor's card
- The verification level and what was checked — in words, not just a badge.
- Extra checks: insurance and references from past clients, if recorded.
- Specialisations and city: what they do and where they work.
- Status: a contractor who is paused or under review stays in the catalogue but does not take requests — such a card has no invite button.
If something is missing from the card, ask at the site visit: a good contractor will show documents and finished projects.
Site visit and measurement — before the contract
A price from a floor plan is not a promise. On site there turns out to be a load-bearing wall, extra square metres, old wiring — and "the price will not grow" becomes untrue in the first week. So SIVRCE has a strict rule:
- A contractor's quote can be accepted only after that contractor's site visit has taken place. No exceptions.
- "The visit took place" can be marked no earlier than 2 hours before the scheduled time — by the contractor with measurements, or by you with "Yes".
- If the visit did not happen, either side marks it with a reason and can propose a new time.
- When you sign with one contractor, the others' open visits are cancelled with the reason "the client chose another contractor" — nobody travels to a site that already has a contract.
What a quote should contain
A total, a warranty period and lines — labour and materials apart, with quantities. How to read and compare estimates: the estimate guide. Compare the contractor's price with your own estimate and with market prices.
Ask the contractor how the work splits into stages. A good plan follows the same order as the guide to renovation stages: hidden works before they are closed up.
What to ask at the site visit
- What they see in the walls and floors: load-bearing walls, the state of wiring and pipes, how level the screed is.
- Which of the six rough works are already done, if the apartment is a new build.
- Which stages they split the work into and what they hand over with photos.
- What warranty they give and until what date their quote is valid.
- What their estimate leaves out: client-supplied materials, waste removal, delivery.
The answers later become lines of the quote — and lines are easier to compare than promises.
If something goes wrong
- A remark on a stage — in words, at acceptance. The contractor sees what to redo and hands the stage over again.
- The project journal: the contractor records the work with photos, and you read it in the project. Entries marked "Crew only" stay with the crew.
- A price change happens only through an estimate change that you approve.
- A money dispute uses both sides' receipts; an administrator decides.
- The contractor disappears before work starts: until the first work stage has begun, the choice of contractor can be undone.
A contractor does not see your phone or address before agreeing; contacts open only to the chosen contractor or one who has agreed.
What the contract fixes
- The amount: the total of the accepted quote becomes the contract amount.
- The stages and their amounts: the total is split across stages in proportion to the estimate lines.
- The dates: on the day of the contract the plan becomes a promise; after that, dates change only with both sides' agreement.
- The warranty: the period the contractor stated in the quote. It starts after the handover act.
If a contractor declines your invitation, invite another. When you sign with one contractor, the others' requests close — there is nothing left for them on the site.
Money: when and how
- Payment follows the acceptance of a stage, not the other way round. The one exception is an advance for the first stage's materials, at most 33% of that stage. SIVRCE suggests this plan in the estimate.
- SIVRCE does not transfer money. You pay the contractor directly and upload the receipt; the contractor confirms it.
- If the amounts do not match, it is a dispute: an administrator decides using both receipts.
Choosing a contractor in SIVRCE step by step
- Price the renovation. In the calculator: area, condition, grade. No sign-up needed.
- Find a contractor. In the contractor catalogue, with the verification level, work and reviews.
- Invite them. "Hire" is an invitation: the contractor answers whether they agree. They see your contacts only after agreeing.
- Confirm the visit. The contractor proposes a time, you confirm. On site they measure and inspect.
- Get the quote. A total, a warranty, the lines. Compare them with your own estimate.
- Sign the contract. A quote is accepted after you sign in, and only after the visit has taken place. The amount is fixed at that moment.
- Accept the stages. The contractor hands over each stage with photos; you accept them in order or write a remark.
- Upload receipts. Every payment comes with a receipt; the contractor confirms it.
Frequently asked questions
How do I check a contractor in Tbilisi?
Ask for an identity document, their tax registration and photos of real work. In SIVRCE these checks appear on the card as a level.
Can I sign a contract without a site visit?
Not in SIVRCE: a quote can be accepted only after that contractor's visit has taken place.
What does SIVRCE cost a homeowner?
Nothing: the estimate, inviting a contractor, stages and receipts are free for homeowners.
What if the contractor does not turn up?
Mark "The visit did not happen" with a short reason. The contractor is told, and you can set a new time or invite someone else.
How much of an advance should I pay?
In the SIVRCE payment plan, the advance covers only the first stage's materials — at most 33% of that stage. The rest is paid after each stage is accepted.
Does SIVRCE hold my money?
No. You pay the contractor directly; SIVRCE keeps the receipts and both sides' confirmations.